Order Processing
Please take note of the following changes:
Final Order Files (zip folder) Attachment -Should be attached in Spectrum order:
- Factory Order Form
- AHU Selection Files: Visualahu (.vahx) files – All Selections – Can be downloaded from TA Select
- Technical Selection Report - All Selections – Can be downloaded from TA Select
- Quote (Excel file)- Can be downloaded from TA Select
- Design Special Quotation: If applicable, include the Design Special Quotation along with supporting documents. Clearly reference the design specials.
- GA drawings
Change Order Files (zip folder) Attachment:
- Factory Order Form
- AHU Selection Files: Visualahu (.vahx) files
- Technical Selection Report
- Quote Excel
- GA drawings
- Design Special Quotation: If applicable, include the Design Special Quotation along with supporting documents. Clearly reference the design specials.
- Change Order Form
- Change order charges quotation If applicable.
A sample of the Factory Order Form is attached for your reference. Ensure all necessary details are accurately filled in before entering spectrum order.
These changes are designed to streamline our order processing system and ensure that all necessary information is readily available for efficient handling. Your adherence to these new requirements is crucial to maintaining our high standards of service.
If you have any questions or need assistance with these changes, please do not hesitate to reach out to [Application Department DTM].
Your cooperation and attention to detail are greatly appreciated.