Download instructions:
Step 1: It's recommended to delete existing TASelect folder before installing new update. Delete existing folder C:\TASelect
Step 2: Navigate to TA Select online portal ➡️ [Downloads] section in navigation menu ➡️ download and install [TASELECT_SALES_V1.07.0.exe]
Step 3: Download and install the hotfix
Download [TASELECT_V1.07.0_Hotfix.exe]
Release notes:
Added New Casing Model: CLCP_ME Xtreme
- The CLCP_ME-Xtreme casing model is now available alongside the existing product line.
- Fully integrated into the current selection workflow using the standard sizes only for now
- Other bug fixes and performance improvements to enhance system stability and enable new feature
- To ensure accuracy and compliance, all modules shall be re-run in TA Select before order entry
Product Update & Cost Optimization Highlights
As part of our continuous improvement and value-engineering initiative, the following updates are introduced in the latest product release:
Cooling Coils
Trane cooling coil costs have increased by approximately 9–10%, reflecting global copper price movements.
- DX Coils (Third-Party)
Optimized sourcing has resulted in a cost reduction of approximately 25%. - UV Lamps
Costs reduced by around 50% following the introduction of a new approved supplier, Airwell – Germicidal Lamps (USA). - Motors
Overall motor costs reduced by approximately 10% through supplier optimization. - Plate Heat Exchangers (PHE)
Cost efficiency improved with a reduction of around 5%. - Air Filters
Throw-Away (TA) filters have been eliminated, streamlining filtration selection. - Dampers (Standard Scope)
Aluminum dampers are now standard, manufactured in-house, replacing GI dampers for improved quality and consistency. - Factory-Installed Heat Recovery Wheels (HRW)
Factory-installed HRWs are now available at approximately 25% lower cost (DRI). - Standardization Policy
All projects will now be supplied with factory-installed Heat Recovery Wheels. Field-installed HRWs are no longer offered, ensuring improved performance, quality control, and installation reliability.
Note: To ensure accuracy and compliance, all modules shall be re-run in TA Select before order entry.